• Skip to primary navigation
  • Skip to main content
Burch Transportation

Burch Transportation

Measured Transportation Solutions

  • Services
  • Projects
  • About
  • Our Team
  • Connect

806 Olympic Street Temporary Traffic Control Plan

Client: Certified Construction Services | Location: Nashville, TN | Completed: June 2019

The construction of an infill redevelopment located at 806 Olympic Street in Nashville, TN required temporary and periodic road closures along the site frontage. The road closures affected both through vehicular traffic and pedestrians on the sidewalk along the site frontage. Burch Transportation prepared a temporary traffic control plan for the construction project, which included signage and barricades for road and sidewalk closures and detour.

Copyright © 2025 ยท Burch Transportation